Perkembangan Kondisi Jembatan 2012 - 2014 |
The Development of
Bridge Condition 2012 - 2014 |
|
|
|
|
|
|
Uraian / Description |
Satuan / Unit |
2012 |
2013 |
2014 |
(1) |
(2) |
(3) |
(4) |
(5) |
1 |
Jumlah Jembatan / Total of
Bridge |
|
|
|
|
|
Beton / Concrete |
Buah |
99 |
100 |
156 |
|
Komposit / Composite |
Buah |
135 |
135 |
71 |
|
Besi / Iron |
Buah |
4 |
4 |
3 |
|
Kayu / Wood |
Buah |
3 |
2 |
4 |
Jumlah / Total |
|
241 |
241 |
234 |
|
|
|
|
|
|
2 |
Panjang Jembatan / Length of
Bridge |
|
|
|
|
|
Beton / Concrete |
Meter |
972,65 |
943,65 |
1.188,00 |
|
Komposit / Composite |
Meter |
1.475,08 |
1.475,08 |
1.146,40 |
|
Besi / Iron |
Meter |
263,00 |
263,00 |
81,00 |
|
Kayu / Wood |
Meter |
2,30 |
31,30 |
71,60 |
Jumlah / Total |
|
2.713,03 |
2.713,03 |
2.487,00 |
|
|
|
|
|
|
3 |
Kondisi Jembatan / Bridge
Condition |
|
|
|
|
|
a. Baik / Good |
|
|
|
|
|
Beton / Concrete |
Meter |
789,30 |
809,00 |
809,00 |
|
Komposit / Composite |
Meter |
972,38 |
972,38 |
972,38 |
|
Besi / Iron |
Meter |
263,00 |
263,00 |
263,00 |
|
Kayu / Wood |
Meter |
11,50 |
11,50 |
11,50 |
|
b. Sedang / Moderate |
|
|
|
|
|
Beton / Concrete |
Meter |
130,85 |
130,85 |
130,85 |
|
Komposit / Composite |
Meter |
492,70 |
492,70 |
492,70 |
|
Besi / Iron |
Meter |
- |
- |
- |
|
Kayu / Wood |
Meter |
- |
- |
- |
|
c. Rusak / Damage |
|
|
|
|
|
Beton / Concrete |
Meter |
11,50 |
9,80 |
0,00 |
|
Komposit / Composite |
Meter |
10,00 |
10,00 |
10,00 |
|
Besi / Iron |
Meter |
- |
- |
- |
|
Kayu / Wood |
Meter |
31,80 |
19,80 |
19,80 |
Jumlah / Total |
|
2.713,03 |
2.713,03 |
2.709,23 |
|
|
|
|
|
|
Sumber : Dinas
Pekerjaan Umum Bina Marga Kab. Probolinggo |
|
Source : Bina Marga
Public Works Service of Probolinggo Regency |
|
Keterangan/Note : - = Data tidak tersedia/Data
not available |
|
|
|
|
|
|
|